• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 20. Case Drain and Brake Hoses and O-ring.
ANGLE AND TILT TUBE REPLACEMENT - Continued

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1098    1099    1100    1101    1102  1103  1104    1105    1106    1107    1108  
img
.
TM 5-2410-240-23-2
0157
CROSSOVER TUBES INSTALLATION
000157
1. Position rear crossover tube (Figure 22, Item 1) and front crossover tube (Figure 22, Item 10) on machine.
2. Install two new O-rings (Figure 22, Item 8) and tube nuts (Figure 22, Item 7) on tube assemblies (Figure 22,
Item 9).
3. Install two new O-rings (Figure 22, Item 12) on two tubes (Figure 22, Item 11), and connect two tube nuts
(Figure 22, Item 13) to two tubes (Figure 22, Item 11).
4. Install three clamps (Figure 22, Item 2), washers (Figure 22, Item 6), clamps (Figure 22, Item 3), washers
(Figure 22, Item 5), and bolts (Figure 22, Item 4) on machine.
5. Install left bulkhead bracket. Refer to Bulkhead Bracket Installation in this work package.
Figure 22. Crossover Tubes and Clamps.
0157
END OF TASK
0157-20


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.