Figure 24. Blade Lift Control Valve.
Figure 27. Blade Tilt Control Valve.

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  205    206    207    208    209  210  211    212    213    214    215  
img
.
TM 5-2410-240-23-3
0196
ASSEMBLY CONTINUED
12. Install cover (Figure 26, Item 3) and three bolts (Figure 26, Item 2) on blade lift control valve (Figure 26,
Item 1).
Figure 26. Valve Solenoid Cover.
0196
C AU T I O N
Install valves in correct order as noted during disassembly. Failure to follow this caution
may damage equipment.
N OT E
Install O-rings as noted during removal.
13. Install six new O-rings (Figure 27, Item 3) on blade tilt control valve (Figure 27, Item 5).
14. Install two fittings (Figure 27, Item 1) and four new O-rings (Figure 27, Item 2) on blade tilt control valve
(Figure 27, Item 5).
15. Install blade tilt control valve (Figure 27, Item 5) on bolts (Figure 27, Item 4).
0196-20