Figure 13. Upper Dash Panel.
INSTRUMENT CLUSTER REPLACEMENT

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  410    411    412    413    414  415  416    417    418    419    420  
img
. .
TM 5-2410-240-23-3
0220
INSTALLATION CONTINUED
000220
7. Install plate (Figure 15, Item 1) on lower dash panel (Figure 15, Item 3) with two bolts (Figure 15, Item 2).
Figure 15. Lower Dash Panel.
0220
8. Install plate (Figure 16, Item 1) on lower dash panel (Figure 16, Item 4) with two bolts (Figure 16, Item 3) and
washers (Figure 16, Item 2).
Figure 16. Lower Dash Panel.
0220
END OF TASK
FOLLOW-ON TASKS
000220
1. Install ignition switch (WP 0222).
2. Verify correct operation of ignition switch and instrument cluster (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE