• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTRUMENT CLUSTER REPLACEMENT
CLEANING AND INSPECTION

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  412    413    414    415    416  417  418    419    420    421    422  
img
.
TM 5-2410-240-23-3
0221
REMOVAL
000221
1. Remove five bolts (Figure 1, Item 1) and instrument cluster (Figure 1, Item 3) from dash panel (Figure 1,
Item 2).
Figure 1. Instrument Cluster.
0221
N OT E
Tag electrical connectors to aid installation.
2. Disconnect electrical connector (Figure 2, Item 1) from instrument cluster (Figure 2, Item 2).
Figure 2. Instrument Cluster Connection.
0221
END OF TASK
0221-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.