• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CLEANING AND INSPECTION
Figure 2. Ignition Switch Connection.

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  414    415    416    417    418  419  420    421    422    423    424  
img
. . . . . . . .
4
TM 5-2410-240-23-3
0222
FIELD MAINTENANCE
-
IGNITION SWITCH REPLACEMENT
0222
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
References
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
WP 0282
0
(WP 0289, Item 51)
0
Equipment Conditions
0
Screwdriver, Torx, T-30, 4" Long (S0345)
Machine parked (TM 5-2410-240-10)
(WP 0289, Item 53)
0
0
Instrument cluster removed (WP 0221)
0
Materials/Parts
0
Drawings Required
Rag, wiping (WP 0290, Item 21)
0
0
TM 5-2410-240-24P, Figure 103
Tiedown strap (WP 0290, Item 31)
0
0
Estimated Time to Complete
0
0.2 Hr
0
REMOVAL
000222
1. Remove two bolts (Figure 1, Item 3) and ignition switch (Figure 1, Item 2) from dash panel (Figure 1, Item 1).
Figure 1. Ignition Switch.
0222
0222-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.