• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 28. Cab Roof Plate and Lift Bar.
Figure 31. Brush Guard and Cover.

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  543    544    545    546    547  548  549    550    551    552    553  
img
.
TM 5-2410-240-23-3
0229
INSTALLATION CONTINUED
N OT E
Install tiedown straps as noted at removal.
39. Install grommet (Figure 29, Item 3) to cab (Figure 29, Item 4).
40. Install wiring harness (Figure 29, Item 2) and one tiedown strap (Figure 29, Item 1).
Figure 29. Cab Flood Lights Wiring Harness and Grommet.
0229
N OT E
Install electrical connectors as tagged at removal.
Install tiedown straps as noted at removal.
41. Connect washer hose (Figure 30, Item 2) to cab (Figure 30, Item 6).
42. Connect four wiring harness connectors (Figure 30, Item 5) from front cab flood lights (Figure 30, Item 4).
43. Install two tiedown straps (Figure 30, Item 1) to wiring harness (Figure 30, Item 3).
Figure 30. Front Cab Flood Lights Wiring Harness.
0229
0229-28


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.