• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 29. Cab Flood Lights Wiring Harness and Grommet.
INSULATION FOAM REPLACEMENT

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  544    545    546    547    548  549  550    551    552    553    554  
img
. .
TM 5-2410-240-23-3
0229
INSTALLATION CONTINUED
44. Install cover (Figure 31, Item 1), brush guard (Figure 31, Item 5), five washers (Figure 31, Item 3), and bolts
(Figure 31, Item 4), to cab (Figure 31, Item 2).
Figure 31. Brush Guard and Cover.
0229
END OF TASK
FOLLOW-ON TASKS
000229
1. Install headliner (WP 0219).
2. Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0229-29/(30 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.