• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 15. Heater Hoses, Clamps, Shutoff Valves, and Bracket Underneath Front Floor Plate.
Figure 17. Heater Hose Retaining Hardware Near HVAC Duct.

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  786    787    788    789    790  791  792    793    794    795    796  
img
. .
TM 5-2410-240-23-3
0247
CLEANING AND INSPECTION
000247
Clean and inspect all components IAW Mechanical General Maintenance Instructions (WP 0282).
END OF TASK
INSTALLATION
000247
N OT E
Remove plugs or caps from hoses and open ports.
Install hoses, shutoff valves, and tied wn straps as noted during removal.
o
1. Install four connectors (Figure 16, Item 4) on two shutoff valves (Figure 16, Item 5).
2. Install six heater hoses (Figure 16, Item 2) on machine.
3. Loosely install eight clamps (Figure 16, Item 3) on six heater hoses (Figure 16, Item 2).
4. Connect four heater hoses (Figure 16, Item 2) on bracket (Figure 16, Item 6) and tighten four clamps
(Figure 16, Item 3).
5. Connect four heater hoses (Figure 16, Item 2) on four connectors (Figure 16, Item 4) and tighten four clamps
(Figure 16, Item 3).
6. Install two new tiedown straps (Figure 16, Item 1) on heater hoses (Figure 16, Item 2).
Figure 16. Heater Hoses, Clamps, Shutoff Valves, and Bracket Underneath Front Floor Plate.
0247
0247-14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.