• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 16. Heater Hoses, Clamps, Shutoff Valves, and Bracket Underneath Front Floor Plate.
Figure 18. Heater Hose Retaining Hardware Behind A/C Heater Assembly.

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  787    788    789    790    791  792  793    794    795    796    797  
img
.
TM 5-2410-240-23-3
0247
INSTALLATION CONTINUED
000247
7. Install bracket (Figure 17, Item 12), washer (Figure 17, Item 11), and bolt (Figure 17, Item 10) on machine
(Figure 17, Item 1).
8. Install outer clamp (Figure 17, Item 6) on two heater hoses (Figure 17, Item 7).
9. Install inner clamp (Figure 17, Item 4), middle clamp (Figure 17, Item 8), outer clamp (Figure 17, Item 6),
washer (Figure 17, Item 5), bolt (Figure 17, Item 9), washer (Figure 17, Item 3), and nut (Figure 17, Item 2) on
bracket (Figure 17, Item 12).
Figure 17. Heater Hose Retaining Hardware Near HVAC Duct.
0247
0247-15


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.