• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 29. A/C Hoses on Right Side of Engine.
A/C LINE REPLACEMENT

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  831    832    833    834    835  836  837    838    839    840    841  
img
. . . .
TM 5-2410-240-23-3
0248
A/C HOSE INSTALLATION CONTINUED
000248
N OT E
When replacing receiver dryer, add 1 fl-oz (30 mL) of fresh refrigerant compressor
lubricating oil when recharging air conditioning system. However, DO NOT add oil when
replacing compressor and receiver dryer at same time.
72. Evacuate and recharge air conditioning system (WP 0254).
END OF TASK
FOLLOW-ON TASKS
000248
1. Install cab roof plate (WP 0233).
2. Install front floor plate (WP 0205).
3. Install rear floor plate (WP 0205).
4. Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0248-34


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.