• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 17. Upper Debris Guard and Retaining Hardware.
Figure 19. Attaching Lifting Device on Winch.

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  978    979    980    981    982  983  984    985    986    987    988  
img
.
TM 5-2410-240-23-3
0265
INSTALLATION CONTINUED
13. Apply sealing compound on six bolts (Figure 18, Items 2).
14. Install upper winch mounting bracket (Figure 18, Item 3), six washers (Figure 18, Item 2), and bolts (Figure 18,
Item 1) on winch (Figure 18, Item 4).
15. Torque six bolts (Figure 18, Item 1) to 100 lb-ft (135 Nm). After tightening bolts, make sure all slack is removed
from between mating surfaces. If misaligned, loosen bolts and repeat installation process.
16. Torque six bolts (Figure 18, Item 1) to 680 lb-ft (922 Nm).
Figure 18. Upper Winch Mounting Bracket and Retaining Hardware.
0265
0265-15


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.