• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 27. Right Debris Guard and Retaining Hardware.
WINCH MANIFOLD BLOCK SERVICE

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  988    989    990    991    992  993  994    995    996    997    998  
img
. .
TM 5-2410-240-23-3
0265
INSTALLATION CONTINUED
33. Install upper right washer (Figure 29, Item 3) and bolt (Figure 29, Item 4) on plate (Figure 29, Item 2) on right
side of winch (Figure 29, Item 1).
Figure 29. Upper Right Bolt and Washer on Plate.
0265
END OF TASK
FOLLOW-ON TASKS
000265
1. Install arctic kit battery box (WP 0275).
2. Install rear bottom guards (WP 0156).
3. Fill hydraulic system (WP 0160).
4. Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0265-25/(26 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.