• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 36. Bolt Installation - Center Belly Plates.
Figure 37. Data Plate for Shipping the D6K Dozer with Winch.

Field Maintenance Manual 3 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1201    1202    1203    1204    1205  1206  1207    1208    1209    1210    1211  
img
TM 5-2410-240-23-3
0284
RESTORING MACHINE AFTER TRANSPORT ALL TRANSPORT METHODS CONTINUED
000284
Highway and OCONUS Rail Transport
000284
1. Position dozer blade for service position. Refer to Dozer Blade Stowage/Unstowage in this work package.
2. Install ROPS/FOPS, exhaust stack, and headrest. Refer to ROPS/FOPS Removal, Installation in this work
package.
CONUS Rail Transport
000284
Position dozer blade for service position. Refer to Dozer Blade Stowage/Unstowage in this work package.
Marine Transport
000284
There are no restorative requirements after marine transport.
Air Transport
000284
Position dozer blade for service position. Refer to Dozer Blade Stowage/Unstowage in this work package.
Airdrop
000284
1. Position dozer blade for service position. Refer to Dozer Blade Stowage/Unstowage in this work package.
2. Install ROPS/FOPS, exhaust stack, and headrest. Refer to ROPS/FOPS Removal, Installation in this work
package.
3. Remove load support T-bolts and reinstall bolts at belly plates. Refer to Restoring Powertrain After Airdrop in
this work package.
END OF TASK
FOLLOW-ON TASKS
000284
Install cold-start ether cylinder (TM 5-2410-240-10).
END OF TASK
0284-37


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.