Table 1. Powertrain Troubleshooting Procedures - Continued.
0020
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
N OT E
1405-3 Transmission Sole-
noid Valve #5 Voltage
It may be necessary to remove winch (if equipped) to access transmis-
Above Normal - Contin-
sion solenoid valves.
ued
18. Remove two bolts (Figure 74,
Item 3) and guard (Figure 74,
Item 4) from machine.
19. Remove 15 bolts (Figure 74,
Item 1) and plate (Figure 74,
Item 2) from machine.
Figure 74. Guard, Plate, and Retaining Hardware.
0020
20. Disconnect transmission solenoid
valve #5 connector P-C5 (WP
0018, Figure 75) from transmis-
sion solenoid valve #5 (WP 0145).
21. Using a digital multimeter (WP
1.
If continuity is found, replace pow-
0296), test for continuity between
ertrain ECM (WP 0175). Ensure all
pin I on transmission harness con-
harness connectors are recon-
nector P-C1 (WP 0018, Figure 56)
nected. Verify correct operation of
and pin 1 on transmission solenoid
machine (TM 5-2410-241-10).
valve #5 connector P-C5 (WP
2.
If continuity is NOT found, replace
0018, Figure 75).
transmission sensor harness (WP
0173). Ensure all harness connec-
tors are reconnected. Verify cor-
rect operation of machine (TM 5-
2410-241-10).
22. Ensure all harness connectors are
reconnected.