• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Pressure Gauge.
Figure 5. Flow Compensator Adjustment.

Field Maintenance Manual 1 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  998    999    1000    1001    1002  1003  1004    1005    1006    1007    1008  
img
.
TM 5-2410-241-23-1
0035
STEERING HYDRAULIC CIRCUIT TESTS CONTINUED
00035
Margin Pressure Test and Adjustment
00035
14. Remove 8T0856 pressure gauge (Figure 4, Item 1) from 1U5793 pressure differential gauge fitting (Figure 4,
Item 2).
15. Install 8T0861 pressure gauge (Figure 4, Item 1) on 1U5793 pressure differential gauge fitting (Figure 4,
Item 2).
16. Ensure parking brake is engaged and implement lockout switch is in LOCK position (TM 5-2410-241-10).
17. Start machine and allow it to run for 15 minutes to reach normal operating temperature (TM 5-2410-241-10).
18. Ensure that blade is at rest flat on the ground (TM 5-2410-241-10).
19. Set machine to HIGH IDLE (RABBIT MODE) on the throttle switch (TM 5-2410-241-10).
20. Move bulldozer blade control handle half way into the RAISE position and record pressure shown on the differ-
ential pressure gauge (Figure 4, Item 3).
21. Differential pressure gauge (Figure 4, Item 3) should read 290 to 320 psi (2,000 to 2,200 kPa) while blade is in
motion.
a. If pressure is NOT in specification, proceed to step 22.
b. If pressure is within specification, proceed to step 36.
Figure 4. Test Equipment Installation.
035
0035-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.