STEERING HYDRAULIC CIRCUIT TESTS CONTINUED
00035
Margin Pressure Test and Adjustment - continued
00035
30. Start machine and allow it to run for 15 minutes to reach normal operating temperature (TM 5-2410-241-10).
31. Ensure park brake switch is in ON position (TM 5-2410-241-10).
32. Set machine to HIGH IDLE (RABBIT MODE) on the throttle switch (TM 5-2410-241-10).
33. Ensure blade is positioned on the ground (TM 5-2410-241-10).
34. Move bulldozer blade control handle half way into the RAISE position and record pressure shown on the differ-
ential pressure gauge (Figure 6, Item 1).
35. Differential pressure gauge (Figure 6, Item 1) should read 290 to 320 psi (2,000 to 2,200 kPa) while blade is in
motion.
a. If pressure is NOT within specification, repeat steps 22 through 34.
b. If pressure is within specified range, proceed to step 36.