• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 1. Preventive Maintenance Checks and Services (PMCS) - Continued
Figure 7. Torque Converter Screen.

Field Maintenance Manual 1 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1033    1034    1035    1036    1037  1038  1039    1040    1041    1042    1043  
img
TM 5-2410-241-23-1
0039
Table 1. Preventive Maintenance Checks and Services (PMCS) - Continued.
LOCATION
ITEM TO
ITEM
NOT FULLY MISSION
CHECK/
SERVICE
NO.
INTERVAL
PROCEDURE
CAPABLE IF:
N OT E
15
Every 1,000
Torque
(Cont) Service
Converter
Scavenge screen may fall out of hose when removed from torque
Hours or six
Scavenge
converter housing.
months
Screen - Clean
c. Remove four bolts (Figure 7,
Item 3), washers (Figure 7, Item 2),
two split clamps and hose (Figure 7,
Item 1) from torque converter housing
(Figure 7, Item 4).
d. Remove torque converter washer
and scavenge screen (Figure 7,
Item 5) from hose (Figure 7, Item 1).
e. Wash screen (Figure 7, Item 5) in
nonflammable solvent and dry screen
with compressed air.
f. Install washer and screen (Figure
7, Item 5) in torque converter housing
(Figure 7, Item 4).
g. Connect hose (Figure 7, Item 1),
two split clamps, four washers (Figure
7, Item 2), and bolts (Figure 7, Item 3)
to torque converter housing (Figure 7,
Item 4).
h. Install middle bottom guards, refer
to WP 0199.
0039-16


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.