Figure 7. Torque Converter Screen.
Figure 8. Transmission Magnetic Screen.

Field Maintenance Manual 1 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1035    1036    1037    1038    1039  1040  1041    1042    1043    1044    1045  
img
TM 5-2410-241-23-1
0039
Table 1. Preventive Maintenance Checks and Services (PMCS) - Continued.
LOCATION
ITEM TO
CHECK/
ITEM
NOT FULLY MISSION
NO.
INTERVAL
PROCEDURE
CAPABLE IF:
SERVICE
a. Clean transmission magnetic
16
Every 1,000
Magnetic screen plugged.
Transmission
Service
screen when transmission oil is
Magnetic
Hours or six
changed.
Screen - Clean
months
b. Remove middle bottom guards,
(WP 0199).
c. Remove four nuts (Figure 8,
Item 1), cover (Figure 8, Item 2), O-
ring (Figure 8, Item 4) and spring
washer (Figure 8, Item 5) from housing
(Figure 8, Item 3).
d. Remove screen (Figure 8, Item 7)
and magnetic assembly (Figure 8,
Item 8) from housing (Figure 8,
Item 3).
e. Clean screen (Figure 8, Item 7) and
magnetic assembly (Figure 8, Item 8)
in nonflammable solvent.
f. Install new O-ring (Figure 8, Item 4)
on cover (Figure 8, Item 2).
g. Install screen (Figure 8, Item 7) and
magnetic assembly (Figure 8, Item 8)
in housing (Figure 8, Item 3).
h. Install spring washer (Figure 8,
Item 5), cover (Figure 8, Item 2), and
four nuts (Figure 8, Item 1) on housing
(Figure 8, Item 3).
i. Install middle bottom guards,
(WP 0199).
0039-18