Figure 2. O-rings.
TRANSMISSION OIL COOLER CORE REPLACEMENT

Field Maintenance Manual 1 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1049    1050    1051    1052    1053  1054  1055    1056    1057    1058    1059  
img
.
TM 5-2410-241-23-1
0041
INSTALLATION CONTINUED
3. Install cooler (Figure 3, Item 3), two washers (Figure 3, Item 1), and nuts (Figure 3, Item 2) on machine.
4. Install two washers (Figure 3, Item 10), bolts (Figure 3, Item 9) on cooler (Figure 3, Item 3).
5. Install fitting (Figure 3, Item 8) on cooler (Figure 3, Item 3).
6. Connect lower hose (Figure 3, Item 7) on fitting (Figure 3, Item 8).
7. Install fitting (Figure 3, Item 5) and plug (Figure 3, Item 4) on cooler (Figure 3, Item 3).
8. Connect upper hose (Figure 3, Item 6) on fitting (Figure 3, Item 5).
Figure 3. Cooler.
0041
END OF TASK
FOLLOW-ON TASKS
00041
1. Fill hydraulic tank (WP 0184).
2. Install engine enclosure left door guard (WP 0202).
3. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE