Home
Download PDF
Order CD-ROM
Order in Print
Figure 5. Hose and Lines.
UPPER COOLANT TANK REPLACEMENT
Field Maintenance Manual 1 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
TM
5-2410-241-23-1
0042
FOLLOW-ON TASKS
00042
1.
Install
engine
oil
cooler
(
WP
0084
).
2.
Install
bottom
guard
(third
from
front)
(WP
0199).
3. Verify correct
operation
of
machine
(TM
5-2410-241-10).
END
OF
TASK
END
OF
WORK
PACKAGE
0042-7/(8
blank)