• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 63. Lines.
Figure 1. Ether Bottle.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  128    129    130    131    132  133  134    135    136    137    138  
img
.
20
TM 5-2410-241-23-2
0060
FIELD MAINTENANCE
-
ETHER BOTTLE, VALVE, BRACKET, AND RELAY REPLACEMENT
0060
Ether Bottle Removal, Ether Line Removal, Ether Valve Removal, Ether Valve and Bottle Support Bracket
Removal, Ether Relay Removal, Cleaning and Inspection, Ether Relay Installation, Ether Valve and Bottle
Support Bracket Installation, Ether Valve Installation, Ether Line Installation, Ether Bottle Installation
INITIAL SETUP
Equipment Condition
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Machine parked (TM 5-2410-241-10)
0
(WP 0302, Item 65)
0
Drawing Required
0
Materials/Parts
TM 5-2410-241-24P, Figure 17
0
0
Rag, Wiping (WP 0303, Item 24)
0
Estimated Time to Complete
0
Tiedown Strap (WP 0303, Item 36)
0
1.0 Hr
Gasket
0
0
References
0
TM 5-2410-241-10
0
WP 0295
0
0060-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.