• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 9. Oil Supply Line.
Figure 11. Turbocharger Elbow.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  161    162    163    164    165  166  167    168    169    170    171  
img
.
TM 5-2410-241-23-2
0062
INSTALLATION CONTINUED
15. Install clamps (Figure 10, Item 1) on oil supply line (Figure 10, Item 2) and oil drain line (Figure 10, Item 3).
Install two washers (Figure 10, Item 5), bolt (Figure 10, Item 6) and nut (Figure 10, Item 4).
Figure 10. Line Clamp.
0062
0062-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.