• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Hub Pulley Assembly.
Figure 5. Pulley.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  359    360    361    362    363  364  365    366    367    368    369  
img
.
TM 5-2410-241-23-2
0095
REMOVAL CONTINUED
6. Remove bearing (Figure 4, Item 7), cup (Figure 4, Item 6), and spacer (Figure 4, Item 5) from hub (Figure 4,
Item 4).
N OT E
Note position and orientation of seal to aid installation.
7. Remove seal (Figure 4, Item 1), bearing (Figure 4, Item 2), and cup (Figure 4, Item 3), from hub (Figure 4,
Item 4). Discard seal.
Figure 4. Hub.
0095
0095-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.