TM 5-2410-241-23-2
0138
INSTALLATION CONTINUED
14. Install two washers (Figure 14, Item 4), bolts (Figure 14, Item 5), and nuts (Figure 14, Item 3) on sprocket
segment (Figure 14, Item 2).
15. Tighten nuts (Figure 14, Item 3) to 221 lb-ft (300 Nm).
16. Tighten nuts (Figure 14, Item 3) an additional 1/3 turn.
17. Check torque on nuts (Figure 14, Item 3). Minimum torque on nuts to 420 lb-ft (570 Nm).
18. Remove three bolts (Figure 14, Item 6), washers (Figure 14, Item 7), and cap (Figure 14, Item 8) from final
drive assembly (Figure 14, Item 1).
Figure 14. Cap and Sprocket Bolts.
0138
END OF TASK
FOLLOW-ON TASKS
000138
1. Install ROPS (WP 0225).
5. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE