TM 5-2410-241-23-2
0148
INSTALLATION CONTINUED
8. Install new gasket (Figure 21, Item 8), plate (Figure 21, Item 9), two washers (Figure 21, Item 10), and bolts
(Figure 21, Item 11) on torque converter housing (Figure 21, Item 1).
9. Install new seal (Figure 21, Item 7), yoke (Figure 21, Item 6), new O-ring (Figure 21, Item 5), washer
(Figure 21, Item 4), and bolt (Figure 21, Item 3) on torque converter (Figure 21, Item 2). Tighten bolt to 85 lb-ft
(115 Nm).
Figure 21. Yoke.
0148
10. Loosen nut (Figure 22, Item 2) and remove sensor (Figure 22, Item 1) from housing (Figure 22, Item 3).
11. Center gear tooth (Figure 22, Item 5) to align with sensor (Figure 22, Item 1).
12. Install sensor (Figure 22, Item 1) until sensor tip (Figure 22, Item 4) touches gear tooth (Figure 22, Item 5).
13. Set gap between sensor tip (Figure 22, Item 4) and gear tooth (Figure 22, Item 5) by turning sensor
180 degrees (Figure 22, Item 1) counterclockwise.
14. Hold sensor (Figure 22, Item 1) and tighten jam nut (Figure 22, Item 2) to 18 lb-ft (25 Nm) on housing
(Figure 22, Item 3).
Figure 22. Sensor Adjustment.
0148