• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Pivot Shaft Lubrication Tank.
PIVOT SHAFT LUBRICATION LINE REPLACEMENT - Continued

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  864    865    866    867    868  869  870    871    872    873    874  
img
.
TM 5-2410-241-23-2
0158
REMOVAL CONTINUED
N OT E
Note line routing, clamp position and orientation to aid installation.
9. Remove four bolts (Figure 3, Item 2), washers (Figure 3, Item 3), and clamps (Figure 3, Item 4) from line
(Figure 3, Item 1).
10. Loosen tube nut (Figure 3, Item 5) and remove line (Figure 3, Item 1) from fitting (Figure 3, Item 6).
11. Remove line (Figure 3, Item 1) from machine.
N OT E
Note orientation of elbow fitting to aid installation.
12. Remove elbow fitting (Figure 3, Item 6) and two O-rings (Figure 3, Item 7) from pivot shaft housing (Figure 3,
Item 8). Discard O-rings.
Figure 3. Pivot Shaft Lubrication Line.
0158
END OF TASK
0158-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.