• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Battery Box.
Figure 3. Battery Positive Cable to Junction Box.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  869    870    871    872    873  874  875    876    877    878    879  
img
.
TM 5-2410-241-23-2
0159
BATTERY POSITIVE TO JUNCTION BLOCK REMOVAL CONTINUED
N OT E
Note cable routing to aid installation.
Tag and mark all electrical connections to aid installation.
2. Position two covers (Figure 2, Item 4) aside.
3. Loosen two nuts (Figure 2, Item 5) and remove two clamps (Figure 2, Item 3) from batteries (Figure 2, Item 2).
4. Position positive battery cable (Figure 2, Item 1) aside.
Figure 2. Battery Positive Cable.
0159
0159-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.