• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Battery Positive Cable.
Figure 4. Clamps.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  870    871    872    873    874  875  876    877    878    879    880  
img
.
TM 5-2410-241-23-2
0159
BATTERY POSITIVE TO JUNCTION BLOCK REMOVAL CONTINUED
N OT E
Note cable routing to aid installation.
Tag and mark all electrical connections to aid installation.
5. Position cover (Figure 3, Item 8) aside.
6. Remove nut (Figure 3, Item 7), washer (Figure 3, Item 6), and positive battery cable (Figure 3, Item 4) from
junction box (Figure 3, Item 5).
N OT E
Note position of clamps to aid installation.
7. Remove two nuts (Figure 3, Item 2), washers (Figure 3, Item 3), and clamps (Figure 3, Item 1) from positive
battery cable (Figure 3, Item 4).
8. Remove positive battery cable (Figure 3, Item 4) from machine.
Figure 3. Battery Positive Cable to Junction Box.
0159
END OF TASK
0159-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.