• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Harness to Harness.
Figure 6. Harness To Harness.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  978    979    980    981    982  983  984    985    986    987    988  
img
.
TM 5-2410-241-23-2
0172
CLEANING AND INSPECTION
000172
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0295).
END OF TASK
INSTALLATION
000172
N OT E
Install electrical connections and route harness as noted during removal.
1. Position harness (Figure 5, Item 2) on machine.
2. Connect connector (Figure 5, Item 3) to connector (Figure 5, Item 4).
3. Install new tiedown straps (Figure 5, Item 1) on harness (Figure 5, Item 2).
Figure 5. Temp Sensor Connector.
0172
0172-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.