• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7. Right Front Panel Clamps.
Figure 9. Brackets.

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1147    1148    1149    1150    1151  1152  1153    1154    1155    1156    1157  
img
.
TM 5-2410-241-23-2
0190
INSTALLATION CONTINUED
N OT E
Install all hoses, tubes, and fittings as noted during removal.
6. Install two new O-rings (Figure 8, Items 6 and 7) on fitting (Figure 8, Item 2).
7. Install fitting (Figure 8, Item 2) on hydraulic tank (Figure 8, Item 3), and nut (Figure 8, Item 4) on fitting
(Figure 8, Item 2).
8. Install hose (Figure 8, Item 5) on fitting (Figure 8, Item 2).
9. Install hose (Figure 8, Item 1) on fitting (Figure 8, Item 2.
Figure 8. Lines.
0190
0190-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.