• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 10. Lower Hydraulic Suction Line.
HYDRAULIC IMPLEMENT PUMP TANK HOSE REPLACEMENT

Field Maintenance Manual D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1150    1151    1152    1153    1154  1155  1156    1157    1158    1159    1160  
img
. . .
TM 5-2410-241-23-2
0190
INSTALLATION CONTINUED
19. Install clamp (Figure 11, Item 4), washer (Figure 11, Item 3), and bolt (Figure 11, Item 2) on upper hydraulic
suction line (Figure 11, Item 1).
20. Install new tiedown strap (Figure 11, Item 5) on upper hydraulic suction line (Figure 11, Item 1).
Figure 11. Upper Hydraulic Suction Line at Right Front Panel.
0190
END OF TASK
FOLLOW-ON TASKS
000190
1. Install transmission system oil fIlter base (WP 0153).
2. Fill hydraulic system (WP 0184).
3. Install front and rear floor plates (WP 0230 and WP 0231).
4. Install right platform access panels (WP 0208).
5. Install bottom guards (WP 0199).
6. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0190-13/(14 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.