TM 5-2410-241-23-2
0196
INSTALLATION CONTINUED
8. Refer to hydraulic implement line replacement (WP 0191) and hydraulic oil cooler line replacement (WP 0189)
for remaining counterbalance valve line installation.
END OF TASK
FOLLOW-ON TASKS
000196
1. Install right platform access panels (WP 0208).
2. Install front and rear floor plates (WP 0230).
4. Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0196-8