10
TM 5-2410-241-23-3
FIELD MAINTENANCE INSTRUCTIONS
-
RIPPER CARRIAGE REPLACEMENT
028
2
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Personnel Required
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Two
0
References
0
0
Hammer, Hand, Soft Face, Dead Blow 52 oz
0
0
Equipment Condition
0
0
Stand Assembly, Jack Stand
Machine parked (TM 5-2410-241-10)
0
0
0
Wrench, Torque, Click, Ratcheting, 3/4" Drive,
Drawing Required
0
0
Lifting Device (5,000-lb capacity)
0
0
Wood block 8x8x12
0
Estimated Time to Complete
0
Materials/Parts
2.5 Hr
0
0
0
0
0282-1