• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CLEANING AND INSPECTION
Figure 1. Ripper Carriage.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  877    878    879    880    881  882  883    884    885    886    887  
img
. . . . . . . . . . .
10
TM 5-2410-241-23-3
0282
FIELD MAINTENANCE INSTRUCTIONS
-
RIPPER CARRIAGE REPLACEMENT
028
2
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
Personnel Required
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Two
0
(WP 0302, Item 65)
References
0
0
Hammer, Hand, Soft Face, Dead Blow 52 oz
WP 0295
(S0221) (WP 0302, Item 68)
0
0
Sling, Multiple Leg (WP 0302, Item 54)
Equipment Condition
0
0
Stand Assembly, Jack Stand
Machine parked (TM 5-2410-241-10)
0
(WP 0302, Item 56)
0
Ripper shanks removed (WP 0281)
0
Wrench, Torque, Click, Ratcheting, 3/4" Drive,
Drawing Required
600 lb-ft (WP 0302, Item 72)
0
0
Lifting Device (5,000-lb capacity)
TM 5-2410-241-24P, Figure 147
0
0
Wood block 8x8x12
0
Estimated Time to Complete
0
Materials/Parts
2.5 Hr
0
0
Rag, Wiping (WP 0303, Item 24)
0
Tag, Marker (WP 0303, Item 34)
0
0282-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.