• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 9. Engine Compartment Arctic Kit Heater Harness.
Figure 12. Arctic Kit Heater Switch.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  943    944    945    946    947  948  949    950    951    952    953  
img
.
TM 5-2410-241-23-3
0290
ENGINE COMPARTMENT ARCTIC KIT HEATER HARNESS INSTALLATION CONTINUED
3. Connect engine compartment arctic kit heater harness connector (Figure 10, Item 2) to fuel metering valve
(Figure 10, Item 1).
4. Connect engine compartment arctic kit heater harness connector (Figure 10, Item 4) to arctic kit heater
(Figure 10, Item 3).
Figure 10. Engine Compartment Arctic Kit Heater Harness at Heater.
0290
END OF TASK
ARCTIC KIT HEATER SWITCH HARNESS INSTALLATION
000290
1. Install arctic kit heater switch harness on machine. Connect arctic kit heater switch harness (Figure 11, Item 1)
to arctic kit heater platform harness (Figure 11, Item 4).
2. Install grommet (Figure 11, Item 2) on arctic kit heater switch harness (Figure 11, Item 1).
3. Install grommet (Figure 11, Item 2) on upper right access panel (Figure 11, Item 3).
4. Connect arctic kit heater switch harness to arctic kit heater switch, refer to this work package.
Figure 11. Arctic Kit Heater Switch Harness.
0290
END OF TASK
0290-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.