• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 6. Engine Compartment Arctic Kit Heater Harness.
Figure 8. Platform Arctic Kit Heater Harness.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  940    941    942    943    944  945  946    947    948    949    950  
img
. . . .
TM 5-2410-241-23-3
0290
PLATFORM ARCTIC KIT HEATER HARNESS REMOVAL
000290
1. Remove front floor plate (WP 0230) and rear floor plate (WP 0231).
2. Disconnect platform arctic kit heater harness from arctic kit heater switch harness, refer to this work package.
3. Disconnect platform arctic kit heater harness from engine compartment arctic kit heater harness, refer to this
work package.
N OT E
Note location and quantity of tiedown straps to aid installation.
Note routing of platform arctic kit heater harness to aid installation.
4. Remove tiedown straps (Figure 7, Item 2) and platform arctic kit heater harness (Figure 7, Item 1) from
platform (Figure 7, Item 3).
5. Disconnect platform arctic kit heater harness (Figure 7, Item 1) connector from machine harness connector
(Figure 7, Item 4) and remove platform arctic kit heater harness from machine.
Figure 7. Platform Arctic Kit Heater Harness.
0290
END OF TASK
CLEANING AND INSPECTION
000290
Clean and inspect all parts IAW Electrical General Maintenance Instructions (WP 0296).
END OF TASK
0290-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.