• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 12. Arctic Kit Heater Switch.
ARCTIC KIT HEATER AND BRACKET REPLACEMENT

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  945    946    947    948    949  950  951    952    953    954    955  
img
. .
TM 5-2410-241-23-3
0290
ARCTIC KIT HEATER SWITCH INSTALLATION CONTINUED
N OT E
Install washers as noted during removal.
8. Install upper right access panel (Figure 14, Item 1), 14 washers (Figure 14, Item 3), bolts (Figure 14, Item 2),
and ladder clip (Figure 14, Item 4).
9. Install right arm rest (WP 0208).
Figure 14. Upper Right Access Panel.
0290
END OF TASK
FOLLOW-ON TASKS
Verify correct operation of machine (TM 5-2410-241-10).
END OF TASK
END OF WORK PACKAGE
0290-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.