• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7. Platform Arctic Kit Heater Harness.
Figure 9. Engine Compartment Arctic Kit Heater Harness.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  941    942    943    944    945  946  947    948    949    950    951  
img
. . .
TM 5-2410-241-23-3
0290
PLATFORM ARCTIC KIT HEATER HARNESS INSTALLATION
000290
N OT E
Install tiedown straps as noted during removal.
Position platform arctic kit heater harness as noted during removal.
1. Position platform arctic kit heater harness on machine. Connect platform arctic kit heater harness (Figure 8,
Item 1) connector to machine harness connector (Figure 8, Item 4).
2. Install platform arctic kit heater harness (Figure 8, Item 1) and new tiedown straps (Figure 8, Item 2) on
platform (Figure 8, Item 3).
3. Connect platform arctic kit heater harness to engine compartment arctic kit heater harness, refer to this work
package.
4. Connect platform arctic kit heater harness to arctic kit heater switch harness, refer to this work package.
5. Install front floor plate (WP 0230) and rear floor plate (WP 0231).
Figure 8. Platform Arctic Kit Heater Harness.
0290
END OF TASK
0290-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.