• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TAGGING INSTRUCTIONS
Figure 1. Connector Inspection.

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  989    990    991    992    993  994  995    996    997    998    999  
img
. . . . . . . . . . . . . .
12
TM 5-2410-241-23-3
0296
FIELD MAINTENANCE
-
ELECTRICAL GENERAL MAINTENANCE INSTRUCTIONS
0
296
Connector and Wire Inspection, Splicing Wires, Heat-shrinkable Tubing (Electrical Insulating Sleeving),
Ring Terminal Repair, Military Connector Repair, Weatherproof Connector Repair, Electrical Ground
Points, Multimeter Usage, Relay Inspection and Testing, Circuit Breaker Inspection and Testing
INITIAL SETUP
Materials/Parts
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
Cloth, Abrasive (WP 0303, Item 7)
0
(WP 0302, Item 65)
Detergent, General Purpose, Liquid
0
Crimp Tool (WP 0302, Item 18)
(WP 0303, Item 8)
0
0
Crimping Tool, Terminal (S0159)
Insulating Sleeving, Electrical
(WP 0302, Item 68)
(WP 0303, Item 14)
0
0
Heat Gun, Electric (WP 0302, Item 68)
Solder, Tin Alloy (WP 0303, Item 33)
0
0
Multimeter (S0695) (WP 0302, Item 68)
Tag, Marker (WP 0303, Item 34)
0
0
Remover, Electrical Contact, Red (WP 0302,
Tiedown Strap (WP 0303, Item 36)
0
Item 47)
Equipment Conditions
0
0
Soldering Gun (S0159) (WP 0302, Item 68)
0
Battery switch in OFF position
(TM 5-2410-241-10)
0
0296-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.