• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 48. Outer Axle Shaft.
TORQUE LIMITS

Field Maintenance Manual 3 D7R Dozer Type I With Winch and Type II With Ripper
Page Navigation
  1043    1044    1045    1046    1047  1048  1049    1050    1051    1052    1053  
img
.
TM 5-2410-241-23-3
0297
TOWING WITH ENGINE STOPPED CONTINUED
0297
6. Attach tow cable to towing eye (Figure 50, Item 1) on front of machine if towing from front.
Figure 50. Front Towing Eye.
000297
7. Attach tow cable to towing eyes (Figure 51, Item 1) on rear of machine if towing from rear.
Figure 51. Rear Towing Eyes.
000297
FOLLOW-ON TASK
0297
1. Install axle shafts (WP 0116).
2. Verify operation of machine (TM 5-2410-2410-10).
END OF TASK
END OF WORK PACKAGE
0297-44


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.