TM 5-2410-240-10
0012
Table 1. Preventive Maintenance Checks and Services (PMCS) - Continued
LOCATION
ITEM TO BE
CHECKED
OR
EQUIPMENT NOT
ITEM
MAN-
SERVICED
PROCEDURE
READY/AVAILABLE IF:
NO.
INTERVAL HOURS
a. Monitor action light indicator in
25
Before
Action Light
Indicator
indicators and gauges display.
b. If action light indicator is ON,
Action light ON.
machine needs service.
Figure 15.
Blade Float and Action Light Indicators.
0012
26
Before
Messenger
With engine running, observe the
Information shows machine
Display
Messenger Display.
is not operating properly or
messenger is not
functioning.
27
Before
Hydraulic
Perform a functional check of all
Class III oil leak is evident.
Controls
hydraulic systems: blade lift, blade
Any hydraulic system or
tilt, blade angle, and ripper or
function does not operate
properly.
28
Before
Lights
Check operation of flood lights
Any lights inoperative if
required for mission.
29
Before
Wipers and
Operate all wipers and washers to Wipers and washers not
verify correct operation (WP 0004). operating if required for
Washers
mission.
30
Before
Backup Alarm a. Verify that backup alarm
Backup alarm does not
and Horn
functions when left joystick is
function.
moved to reverse position.
b. Check operation of horn.
Horn does not function.
0012-19