• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 13. Core Assembly.
Figure 15. Core Assembly and Cooling Module.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  37    38    39    40    41  42  43    44    45    46    47  
img
.
TM 5-2410-240-23-2
0039
INSTALLATION
00039
1. Install new O-ring (Figure 14, Item 7) on drain valve (Figure 14, Item 3).
2. Install drain valve (Figure 14, Item 3), two spacers (Figure 14, Item 1), and bolts (Figure 14, Item 2) on core
assembly (Figure 14, Item 6).
3. Loosely install clamp (Figure 14, Item 4) on hose (Figure 14, Item 5).
4. Connect hose (Figure 14, Item 5) on drain valve (Figure 14, Item 3) and tighten clamp (Figure 14, Item 4).
Figure 14. Drain Valve.
0039
0039-16


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.