• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 8. Cooling System Hose Retaining Hardware.
AIR INLET, EXHAUST HOSES, AND CHECK VALVE REPLACEMENT

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  57    58    59    60    61  62  63    64    65    66    67  
img
. . .
TM 5-2410-240-23-2
0040
FOLLOW-ON TASKS
00040
1. Install secondary fuel filter (WP 0063).
2. Fill engine cooling system (WP 0043).
3. Install right engine access panel (WP 0182).
4. Install left engine access panel (WP 0184).
5. Install engine bottom guard (WP 0156).
6. Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0040-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.