• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
NATO SLAVE AND CABLES REPLACEMENT - Continued
ETHER VALVE REPLACEMENT

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  153    154    155    156    157  158  159    160    161    162    163  
img
.
TM 5-2410-240-23-2
0047
Figure 7. NATO Slave and Bracket.
0047
17. Install plate (Figure 8, Item 2) and close left front access door (Figure 8, Item 1).
Figure 8. Left Front Access Door and Plate.
0047
END OF TASK
FOLLOW-ON TASKS
00047
Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0047-7/(8 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.