• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. NATO Slave Cables and Brackets.
NATO SLAVE AND CABLES REPLACEMENT - Continued

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  151    152    153    154    155  156  157    158    159    160    161  
img
.
TM 5-2410-240-23-2
0047
INSTALLATION CONTINUED
9. Install negative cable (Figure 6, Item 5) and nut (Figure 6, Item 4) on starter (Figure 6, Item 3).
10. Install positive cable (Figure 6, Item 1) and nut (Figure 6, Item 2) on starter (Figure 6, Item 3).
Figure 6. Starter Cable Connections.
0047
0047-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.