• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 51. Engine ECM.
Figure 2. NATO Slave and Bracket.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  147    148    149    150    151  152  153    154    155    156    157  
img
. .
8
TM 5-2410-240-23-2
0047
MAINTENANCE INSTRUCTIONS
-
NATO SLAVE AND CABLES REPLACEMENT
00
47
Removal, Cleaning and Inspection, Installation
INITIAL SETUP
References
Tools and Special Tools
0
0
Tool Kit, General Mechanic's
WP 0282
0
(WP 0289, Item 51)
0
Equipment Conditions
0
Wrench, Torque, Click, Ratcheting, 3/8" Drive,
Machine parked (TM 5-2410-240-10)
75 lb-ft (WP 0289, Item 59)
0
0
Drawings Required
Materials/Parts
0
0
TM 5-2410-240-24P, Figure 9
Rag, wiping (WP 0290, Item 21)
0
0
Tag, marker (WP 0290, Item 30)
Estimated Time to Complete
0
0
Inner gasket
0
1.0 Hr
0
Lockwasher (2)
0
Outer gasket
0
REMOVAL
00047
WARN I N G
Make sure master battery switch is in OFF position before replacing NATO slave and
cables. Failure to follow this warning may result in injury or death to personnel or damage
to equipment.
1. Open left front access door (Figure 1, Item 1) and remove plate (Figure 1, Item 2).
Figure 1. Left Front Access Door and Plate.
0047
0047-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.