TM 5-2410-240-23-2
0051
FOLLOW-ON TASKS
00051
1. If arctic kit heater equipped, install arctic kit heater (WP 0278).
2. If arctic kit heater equipped, install arctic kit heater fuel metering pump, hose and fittings (WP 0280).
3. If arctic kit heater equipped, install arctic kit heater hoses and fittings (WP 0279).
4. If arctic kit heater equipped, install arctic kit heater harness (WP 0277).
11. Install heater hoses (WP 0247).
12. Install fuel hoses (WP 0174).
14. Install A/C lines (WP 0249).
16. Install air inlet, exhaust hoses, and check valve (WP 0041).
18. Install hood support (WP 0188).
20. Install front cab floor plate (WP 0205).
21. Fill fuel tank (TM 5-2410-240-10).
22. Evacuate and charge A/C System (WP 0254).
23. Verify correct operation of machine (TM 5-2410-240-10).
END OF TASK
END OF WORK PACKAGE
0051-8