• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 16. Turbocharger and Wastegate.
Figure 18. Arctic Kit Heater.

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  374    375    376    377    378  379  380    381    382    383    384  
img
.
TM 5-2410-240-23-2
0079
INSTALLATION CONTINUED
N OT E
Perform steps 16 through 21 only if arctic kit heater equipped.
16. If arctic kit heater equipped, position shield (Figure 17, Item 3) and install clamp (Figure 17, Item 6) and tube
(Figure 17, Item 7) on arctic kit heater (Figure 17, Item 2).
17. Tighten nut (Figure 17, Item 4) and bolt (Figure 17, Item 5) securing clamp (Figure 17, Item 6) and tube
(Figure 17, Item 7) on arctic kit heater (Figure 17, Item 2).
18. Position shield (Figure 17, Item 3) between arctic kit heater (Figure 17, Item 2) and bracket (Figure 17, Item 1).
19. Install two washers (Figure 17, Item 9) and bolts (Figure 17, Item 8), securing shield (Figure 17, Item 3)
between arctic kit heater (Figure 17, Item 2) and bracket (Figure 17, Item 1).
Figure 17. Shield.
0079
0079-18


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.