TM 5-2410-240-23-2
0102
REMOVAL CONTINUED
C AU T I O N
Mark valve links with location information so they can be reinstalled in original locations.
Do not interchange positions of used valve links.
5. Mark and remove 12 valve links (Figure 2, Item 1) from valve stems (Figure 2, Item 2).
Figure 2. Valve Bridge Replacement.
0102
END OF TASK
CLEANING AND INSPECTION
000102
Clean and inspect all components IAW Mechanical General Maintenance Instructions (WP 0282).
END OF TASK