Figure 4. Pump Hoses.
HYDROSTATIC DRIVE PISTON PUMP HOSE AND LINE REPLACEMENT - Continued

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  580    581    582    583    584  585  586    587    588    589    590  
img
TM 5-2410-240-23-2
0108
CLEANING AND INSPECTION
000108
Clean and inspect all components IAW Mechanical General Maintenance Instructions (WP 0282).
END OF TASK
INSTALLATION
000108
N OT E
Install hoses and lines as noted during removal.
1. Install two new O-rings (Figure 4, Item 13) on fitting (Figure 4, Item 8).
2. Install fitting (Figure 4, Item 8) on pump (Figure 4, Item 7).
3. Install line (Figure 4, Item 6) and tube nut (Figure 4, Item 9) on fitting (Figure 4, Item 8).
4. Install two new O-rings (Figure 4, Item 13) on fitting (Figure 4, Item 11).
5. Install fitting (Figure 4, Item 11) on pump (Figure 4, Item 10).
6. Install line (Figure 4, Item 1) and tube nut (Figure 4, Item 12) on fitting (Figure 4, Item 11).
7. Install clamp (Figure 4, Item 4), bolt (Figure 4, Item 2), two washers (Figure 4, Item 5), and nut (Figure 4,
Item 3) on line (Figure 4, Item 1).
0108-7