• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Cooler Hoses.
OIL COOLER HOSE REPLACEMENT - Continued

Field Maintenance Manual 2 D6K Dozer Type I With Winch and Type II With Ripper
Page Navigation
  590    591    592    593    594  595  596    597    598    599    600  
img
.
TM 5-2410-240-23-2
0109
CLEANING AND INSPECTION
000109
Clean and inspect all components IAW Mechanical General Maintenance Instructions (WP 0282).
END OF TASK
INSTALLATION
000109
N OT E
Install hoses and clamps as noted during removal.
Remove caps for lines, hoses, and fittings.
1. Install two new O-rings (Figure 4, Item 6) on fitting (Figure 4, Item 7).
2. Install fitting (Figure 4, Item 7) on cooler (Figure 4, Item 1).
3. Install hose (Figure 4, Item 5) on fitting (Figure 4, Item 7).
4. Install two new O-rings (Figure 4, Item 2) on fitting (Figure 4, Item 3).
5. Install fitting (Figure 4, Item 3) on cooler (Figure 4, Item 1).
6. Install hose (Figure 4, Item 4) on fitting (Figure 4, Item 3).
.
Figure 4. Cooler Hoses.
0109
0109-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.